THE BIG DIG
(Page 5 of 5)
RELATED CONTENT
With the search for an alternative type of energy in high demand, geothermal energy — energy from t...
You can build this super-simple and super-effective solar collector in just one hour!...
GEOTHERMAL HOME April/May 2001 Check list If you think geothermal power is right for you and your h...
GEOTHERMAL POWER September/October 1971
By BARRY FISHLER/COVER
...
Whole-house fans are an easy, affordable way to cool your home without using air conditioning. Thes...
When possible, vertical wells are separated by 15 feet to
avoid thermal interference between wells. The closed-loop
heat exchanger is constructed from two parallel lengths of
0.75-inch polyethylene pipe, and a "U" bend is welded to
the bottom end to connect the supply and return side of the
exchanger. Once the exchanger is assembled, it is
pressure-tested and a ten-foot section of re-bar is taped
to it to keep the lead section straight. Next, a grout line
is loosely attached and the exchanger is filled with water
to prevent it from floating back out of the well if the
well begins to fill with water. Once inserted into the
well, the bore is grouted up with a bentonite clay slurry
and the grout pipe is removed for reuse on the next well.
The bentonite grout serves two functions: to seal the well
and prevent contamination from surface sources, and to
provide a medium for heat transfer between the exchanger
tubing and the side wall of the well bore.
Related info:
Geothermal Checklist
Page:
<< Previous 1 |
2 |
3 |
4 | 5 |